Sheet
Quality

Mockup Log

Every required mock-up – what it shows, where, by whom, and what it must precede.

Built at the start of the job, so mock-ups are priced, scheduled and reviewed before the work they govern goes into fabrication.

What you get

  • Ref and category – Structure, exterior, interior, mechanical & electrical, site / landscape and restoration, numbered E-1, I-1 and so on.
  • Description – Size or extent, the components and interfaces it must show, any test it must pass, and whether it can remain in the work.
  • Source – Specified, shown on the drawings, or builder recommended, with the section and paragraph or the drawing and detail.
  • Mock-up type – Design finalization, QA/QC, or one-off.
  • Location and required before – Where it is built, by which trades, and the condition it has to meet, like “before fabrication of window wall units”.

How it works

  1. The agent inventories the specs, drawings and schedule, and reads 01 43 39 Mock-ups first where the project has it.
  2. It agrees coverage, whether to add builder-recommended mock-ups, and the order with you.
  3. It works one division group at a time and shows you each group before moving on.
  4. As mock-ups are built, it records the dates and comments you give it.
  5. It reports counts by category and source, the mock-ups that gate long-lead fabrication, and the sections that call for a mock-up with no location or size.

Try asking

  • Build a mockup log for the envelope, 07 and 08 first. Add any you’d recommend.
  • Which mock-ups have to be approved before the window wall goes into fabrication?
  • The brick mock-up was approved on the 3rd, update the log.
Details
Output
Sheet
Category
Quality
Builds
Mockup Log (sheet)
Reads
Specifications, drawings, schedule
Learns from
3 example logs